Sign In | Join Free | My frbiz.com |
|
Brand Name : JINZHOU SHITAN
Model Number : GK 200
Certification : ISO9001
Place of Origin : China
MOQ : 1 set
Price : Negotiation
Payment Terms : T/T, Western Union
Supply Ability : 20000 sets per year
Delivery Time : 7-12 days
Packaging Details : Standard Export Package
Product Name : Geological Drilling Rig Prospecting 300mm Diameter GK 200 Hydraulic Borewell Machine
Condition : New
Type : Hydraulic Drilling Rig
Power Type : Diesel
Usage : Water Well,geological exploration
Voltage : 380V
Power(W) : 16.2kw
Dimension(L*W*H) : 1730*860*1360mm
Weight : 585kg
Drilling Depth : 300m
Drilling Diameter : 75-200mm
Engine : Diesel Power
Geological Drilling Rig Prospecting 300mm Diameter GK 200 Hydraulic Borewell Machine
GK 200 Geological Drilling Rig Introduction:
GK-200 Drilling Rig is a light multifunctional engineering project prospecting drilling rig
With the hydraulic feeding mechanism,improve the drilling efficiency,reducing the labor intensity of workers.
The rig is equipped with a ball on a cassette holding mechanism and a six side rod, the rod can be replaced without shutdown, high work efficiency, safe and reliableFurnished with hole bottom pressure gauge pressure indicator,and easy to master the status inside the hole
The handle centered, convenient operation.
GK 200 Geological Drilling Rig Technical Information:
Drilling depth | 60 225 295m |
Drilling diameter | 300 76 46mm |
Drill pipe diameter | 50 42mm |
Spindle Turnable Angle | 0-360degree |
Net weight(excluding the power machine) | 670kg |
Dimension(length*width*height) | 1820*980*1400mm |
Revolving Plate | |
Spindle speed | 900 475 388 205 157 68 r/min |
Maximum torque | 2000N*m |
Driving travel | 400mm |
Maximum Cylinder driving force | 2,9000N |
Maximum Cylinder lifting force | 3,9000N |
Lifter | |
Lifting capacity | 3,0000N |
Bobbin line speed (2 layers) | 0.27 0.64 0.83 1.58 1.64 m/s |
Bobbin diameter | 135mm |
GK 200 Geological Drilling Rig Advantage:
Wide range if P.R.M and well-set gears
Great torque in low P.R.M, fit for coring drilling and piling hole works.
Mobile cylinder installed so that the drilling machine got a free travel of 300mm, ensured easy remove of drilling stem.
Easy to handle, high efficiency, oil hydraulic drive, low labour intensity.
Optimized structure, small volume, and lightweight.
1. The drill pipes/casing pipe will be packed into bundles as 3x3, 3x4, 4x4 etc, and loading into containers after black painting and thread protectors installation.
2. For 20’ container, the max loading weight is 21 metric tons
3. For 40’ container, the max loading weight is 27 metric tons.
4. Usual loading port is XINGANG port in Tianjin, main port in north of China.
The specific steps of soil sampling method are as follows
1. Distribution: samples shall be taken according to the soil type and the distribution of crop varieties, and according to the different soil fertility. The sampling points are distributed in zigzag or snake shape, which should be as uniform and random as possible.
2. Determine the sampling position and depth: the sampling position and depth shall be determined according to the thickness of the cultivated layer. Generally, the sampling depth is 0-20cm
![]() |
Geological Drilling Bore Well Machine Rig Prospecting 300mm Diameter Gk 200 Images |