Sign In | Join Free | My frbiz.com
China Jinzhou City Shitan Machinery Equipment  CO. LTD. logo
Jinzhou City Shitan Machinery Equipment CO. LTD.
Jinzhou City Shitan Machinery Equipment CO. LTD.
Verified Supplier

5 Years

Home > Hydraulic Borewell Machine >

Geological Drilling Bore Well Machine Rig Prospecting 300mm Diameter Gk 200

Jinzhou City Shitan Machinery Equipment CO. LTD.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Geological Drilling Bore Well Machine Rig Prospecting 300mm Diameter Gk 200

  • 1
  • 2

Brand Name : JINZHOU SHITAN

Model Number : GK 200

Certification : ISO9001

Place of Origin : China

MOQ : 1 set

Price : Negotiation

Payment Terms : T/T, Western Union

Supply Ability : 20000 sets per year

Delivery Time : 7-12 days

Packaging Details : Standard Export Package

Product Name : Geological Drilling Rig Prospecting 300mm Diameter GK 200 Hydraulic Borewell Machine

Condition : New

Type : Hydraulic Drilling Rig

Power Type : Diesel

Usage : Water Well,geological exploration

Voltage : 380V

Power(W) : 16.2kw

Dimension(L*W*H) : 1730*860*1360mm

Weight : 585kg

Drilling Depth : 300m

Drilling Diameter : 75-200mm

Engine : Diesel Power

Contact Now

Geological Drilling Rig Prospecting 300mm Diameter GK 200 Hydraulic Borewell Machine

GK 200 Geological Drilling Rig Introduction:

GK-200 Drilling Rig is a light multifunctional engineering project prospecting drilling rig

With the hydraulic feeding mechanism,improve the drilling efficiency,reducing the labor intensity of workers.

The rig is equipped with a ball on a cassette holding mechanism and a six side rod, the rod can be replaced without shutdown, high work efficiency, safe and reliableFurnished with hole bottom pressure gauge pressure indicator,and easy to master the status inside the hole

The handle centered, convenient operation.

GK 200 Geological Drilling Rig Technical Information:

Drilling depth 60 225 295m
Drilling diameter 300 76 46mm
Drill pipe diameter 50 42mm
Spindle Turnable Angle 0-360degree
Net weight(excluding the power machine) 670kg
Dimension(length*width*height) 1820*980*1400mm
Revolving Plate
Spindle speed 900 475 388 205 157 68 r/min
Maximum torque 2000N*m
Driving travel 400mm
Maximum Cylinder driving force 2,9000N
Maximum Cylinder lifting force 3,9000N
Lifter
Lifting capacity 3,0000N
Bobbin line speed (2 layers) 0.27 0.64 0.83 1.58 1.64 m/s
Bobbin diameter 135mm

GK 200 Geological Drilling Rig Advantage:

Wide range if P.R.M and well-set gears

Great torque in low P.R.M, fit for coring drilling and piling hole works.

Mobile cylinder installed so that the drilling machine got a free travel of 300mm, ensured easy remove of drilling stem.

Easy to handle, high efficiency, oil hydraulic drive, low labour intensity.

Optimized structure, small volume, and lightweight.

1. The drill pipes/casing pipe will be packed into bundles as 3x3, 3x4, 4x4 etc, and loading into containers after black painting and thread protectors installation.

2. For 20’ container, the max loading weight is 21 metric tons

3. For 40’ container, the max loading weight is 27 metric tons.

4. Usual loading port is XINGANG port in Tianjin, main port in north of China.

Drilling Rig Applications
It is a survey method to find out the underground geological conditions. It can be divided into: (1) geophysical exploration: lithology, groundwater level, karst cave distribution, etc. are divided according to the conductivity, magnetism, density and the propagation speed of elastic wave in different underground strata and media (water, cavity, rock, etc.). Guide drilling. (2) Drilling: combined with pit (groove) exploration. 3) penetration: it is both an exploration method and an in-situ test method.

The specific steps of soil sampling method are as follows

1. Distribution: samples shall be taken according to the soil type and the distribution of crop varieties, and according to the different soil fertility. The sampling points are distributed in zigzag or snake shape, which should be as uniform and random as possible.

2. Determine the sampling position and depth: the sampling position and depth shall be determined according to the thickness of the cultivated layer. Generally, the sampling depth is 0-20cm

Geological Drilling Bore Well Machine Rig Prospecting 300mm Diameter Gk 200

Geological Drilling Bore Well Machine Rig Prospecting 300mm Diameter Gk 200

Geological Drilling Bore Well Machine Rig Prospecting 300mm Diameter Gk 200

Geological Drilling Bore Well Machine Rig Prospecting 300mm Diameter Gk 200


Product Tags:

geological drilling bore well machine

      

prospecting bore well machine

      

300mm diameter hydraulic borewell machine

      
China Geological Drilling Bore Well Machine Rig Prospecting 300mm Diameter Gk 200 wholesale

Geological Drilling Bore Well Machine Rig Prospecting 300mm Diameter Gk 200 Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Jinzhou City Shitan Machinery Equipment CO. LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)