Sign In | Join Free | My frbiz.com
China Jinzhou City Shitan Machinery Equipment  CO. LTD. logo
Jinzhou City Shitan Machinery Equipment CO. LTD.
Jinzhou City Shitan Machinery Equipment CO. LTD.
Verified Supplier

5 Years

Home > Water Well Drilling Rig Machine >

St 180 Water Well Drilling Machine Rubber Crawler Mounted Large

Jinzhou City Shitan Machinery Equipment CO. LTD.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

St 180 Water Well Drilling Machine Rubber Crawler Mounted Large

  • 1
  • 2

Brand Name : ShiTan

Model Number : ST 180

Certification : ISO9001

Place of Origin : China

MOQ : Negotiation

Price : Negotiation

Payment Terms : T/T, Western Union

Supply Ability : 2000 sets per year

Delivery Time : Within 7-12 days

Packaging Details : wooden box

Product name : ST 180 Rubber Crawler Mounted Large Water Well Drilling Rig Machine

Type : Rotary Drilling Rig

Drilling Depth : 180 Meters

Drilling hole diameter : 180 mm

Weight : 1450KG

Voltage : 220V/380V

Drilling speed : 25-2000rpm

Range of spindle speed(r.p.m) : 0-3000r/min

Warranty : 1 Year

Application : for wooden side hole drilling,Metal Processing,Mine,Wood/Steel,water irrigation works.etc.

Features : Easy operation / free maintaining

Color : Red,Yellow,Blue

Contact Now

ST 180 Rubber Crawler Mounted Large Water Well Drilling Rig Machine

ST 180 Water Well Drilling Rig Machine Product Description

It is suitable for industrial and civil drilling and geothermal drilling. It has the advantages of large drilling diameter, deep drilling, fast footage, flexible movement and high efficiency.

ST 180 Water Well Drilling Rig Technical Data

ST 180 Water Well Drilling Machine Details
ST 180 Drilling depth 180m
ST 180 Drill rod caliber 42mm
Hole diameter 75mm
Drilling angle 90°-75°
Dimensions 2120*875*1480mm
Weight(without power unit) 750kg
Swivel head
Spindle speed 71,182,310,790r/min
Spindle stroke 450mm
Upward displacement speed of idling vertical spindle 0.05m/s
Downward displacement speed of idling vertical spindle 0.067m/s
Spindle pull-down max. 15KN
Spindle lifting capacity max. 25KN
Spindle max.torque 1.5KN.m
Brake diameter 278mm
Brake belt width 50mm
Hoist
Max. lifting capacity 20KN
Hoisting drum revolution 20,39,85,170r/min
Drum diameter 140mm
Wire rope diameter 9.3mm
Wire rope capability 40m
Oil pump
Model YBC-20/125
Rated presure 12.5Mpa
displacement 20ml/r
rated speed 800-2500r/min
Water pump
Displacement max. 95(77)L/min
Working pressure max. 1.2Mpa
Rated pressure 0.7Mpa
Liner diameter 80mm
Piston stroke 100mm
Power(diesel engine or motor)
Rated power 16.2KW
Rated speed 2200r/min
Electric motor Y160M-4
Rated power 11Kw
Rated speed 1460r/min

ST 180 Water Well Drilling Rig Advantages

The machine can be used in various strata, such as water well engineering, geothermal well, anchor pile hole, etc., and can use pipe following drilling tools. It has the advantages of hydraulic control of the whole machine, automatic loading and unloading of drill pipes, crawler chassis, high-power diesel engine, four corner hydraulic balance, stronger terrain applicability and so on

ST 180 Portable Water Well Drilling Rig Attentions

1. Safety inspection shall be carried out when loading and unloading the drilling rig. All parts of the drilling rig shall be complete, and the cable shall be free of electric leakage, drill pipe, drilling tool and other five damage phenomena;
2. The loading of drilling rig shall be firm, and the turning or ramp shall be slow and fixed with steel wire fixing points;
3. When entering the construction site, the rig tower shall be fixed, the area of the drilling site shall be larger than the rig base, and there shall be enough safety space around;
4. The drilling shall be carried out in strict accordance with the hole position, orientation, angle and depth, and the driller shall not change it without authorization;
5. When installing the drill pipe, check the drilling rig to ensure that the drill pipe is not blocked, bent and the screw mouth is not worn. Unqualified drill pipes are strictly prohibited;
6. When loading and unloading the drill bit, strictly prevent the pipe tongs from clamping the cemented carbide sheet, flattening the drill bit and core pipe;
7. When installing the drill pipe, the second drill pipe must be installed after the first one is installed;
8. When drilling with clean water, water supply is not allowed before drilling, and pressure drilling can be carried out only after the water returns, and sufficient flow shall be ensured. It is not allowed to dry the hole. When there is a lot of rock powder in the hole, the water volume shall be increased, the pump on time shall be extended, and the drilling can be stopped only after the hole is flushed;

St 180 Water Well Drilling Machine Rubber Crawler Mounted Large

St 180 Water Well Drilling Machine Rubber Crawler Mounted Large

St 180 Water Well Drilling Machine Rubber Crawler Mounted Large


Product Tags:

180m water well drilling machine

      

crawler mounted water well drilling machine

      

180m crawler mounted drill rig

      
China St 180 Water Well Drilling Machine Rubber Crawler Mounted Large wholesale

St 180 Water Well Drilling Machine Rubber Crawler Mounted Large Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Jinzhou City Shitan Machinery Equipment CO. LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)