Sign In | Join Free | My frbiz.com
China Jinzhou City Shitan Machinery Equipment  CO. LTD. logo
Jinzhou City Shitan Machinery Equipment CO. LTD.
Jinzhou City Shitan Machinery Equipment CO. LTD.
Verified Supplier

5 Years

Home > Soil Testing Drilling Rig >

High Speed Core Engineering Soil Testing Drilling Rig 300 Mm Hole Diameter

Jinzhou City Shitan Machinery Equipment CO. LTD.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

High Speed Core Engineering Soil Testing Drilling Rig 300 Mm Hole Diameter

  • 1
  • 2

Brand Name : JINZHOU SHITAN

Model Number : GK 200

Certification : ISO9001

Place of Origin : China

MOQ : 1 set

Price : Negotiation

Payment Terms : T/T, Western Union

Supply Ability : 5000 sets per year

Delivery Time : 3-5 days

Packaging Details : Standard Export Package

Product Name : Hydraulic High Speed Core Engineering Exploration 200 Meters Soil Testing Drilling Rig

Drilling Depth : 200 Meters

Drilling Diameter : 75-275mm

Condition : New

Type : Core Drilling Rig,water well drilling ,soil testing

Power Type : Diesel Engine

Voltage : 380V

Warranty : 1 Year

Material : Steel

OEM : Acceptable

Color : Optional Red,Yellow

After-sale service : Video Support

Contact Now

High Speed Core Engineering 300 mm Hole Diameter Soil Testing Drilling Rig

GK-200 Soil Testing Drilling Rig

Gk-200 drilling machine is hydraulic feeding with the characteristics of large power, large lifting force (2T) and high transmission torque.

GK-200 Soil Testing Drilling Rig Tech Data:

Drilling Rig
Drilling diameter(mm) 75,91,110,130,150,300
Drilling depth (m) 200,150,100,70,50,30
Drill pipe diameter (mm) 42,50
Drilling angle(°) 90~75
Equipment size(L * B * H) 1730 * 860 * 1360 (mm)
Rig weight (except engine) 700
Mobile device
Moving length 350mm
Leave distance 300mm
Gyrator
Spindle speed (four gear) (r/min) 115,230,505,1010
Spindle travel(mm) 450
Spindle no-load lifting maximum moving speed(m/s) 0.05
Spindle no load drop maximum movement speed(m/s) 0.067
Spindle maximum feed pressure(KN) 15
Spindle maximum lifting force(KN) 25
Spindle maximum output torque(KN• m) 1.5
Winch assembly
Winch maximum lifting force (single rope) 20
Reel speed (r/min) 20,39,85,170
Reel circumferential speed(m/s) 0.172,0.345,0.738,1.476
Reel diameter(mm) 140
Wire rope diameter(mm) 9.3
Wire rope density (m) 40
Brake diameter(mm) 278
Brake band width (mm) 50
Oil pump
Oil pump type YBC -20/125
Nominal pressure (Mpa) 12.5
Rated flow(ml/r) 20
Rated speed(r/min) 800-2500
Diesel engine or motor
Diesel engine 1115
Rated power (KW) 16.2
Rated speed (r/min) 2200
Rated pressure(Mpa) 12.5
Motor type Y160M - 4
Rated power (KW) 11
Rated speed (r/min) 1460


GK-200 Soil Testing Drilling Rig Features:

1.hydraulic cylinder, high efficiency ·wheeled walking mechanism, very convenient for transport and adjusting the drilling rig level. 2.·pressure gauge display the condition of the bottom of the drill hole. ·the drilling rig is equipped with a ball card holding mechanism instead of chuck, and it can be operated without stopping the rod.

GK-200 Soil Testing Drilling Rig Application:

1. With hydraulic automatic feeding device, elevated drilling efficiency.

2. The holding mechanism with upper spherical jaws is used as substitute for chuck. The rod can be replaced without shutdown.

3. Centralized handles, easy operation, safe and reliable.

4. The pump and diesel engine are installed on common base frame in order to have a compact structure and occupy small field area. lightweight, high detachability, easy transportation and suitable for the operations in plains or mountain areas.

Oil filter element:

1. Unscrew and discard the oil filter.

2. Clean the filter shell by self suction and dredge the front and rear differential pressure through holes.

3. Check whether the differential pressure transmitter is normal.

4. Fill the new filter element with oil and apply a layer of oil on the sealing ring of the filter element.

5. When installing the filter element, screw it until it contacts the sealing gasket, and then manually tighten it by 1 / 3 turn.

6. After startup, check whether there is leakage.

Note: the filter element can be replaced only after the screw machine is stopped and the pressure is released. Be careful of hot oil to prevent scalding.

High Speed Core Engineering Soil Testing Drilling Rig 300 Mm Hole Diameter

High Speed Core Engineering Soil Testing Drilling Rig 300 Mm Hole Diameter

High Speed Core Engineering Soil Testing Drilling Rig 300 Mm Hole DiameterHigh Speed Core Engineering Soil Testing Drilling Rig 300 Mm Hole DiameterHigh Speed Core Engineering Soil Testing Drilling Rig 300 Mm Hole Diameter


Product Tags:

core engineering soil testing drilling rig

      

high speed soil testing drilling rig

      

300mm hole diameter soil testing rig

      
China High Speed Core Engineering Soil Testing Drilling Rig 300 Mm Hole Diameter wholesale

High Speed Core Engineering Soil Testing Drilling Rig 300 Mm Hole Diameter Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Jinzhou City Shitan Machinery Equipment CO. LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)